NOCN04 CWAO 171230 GENOT NO. 008CCB THE WORK ON THE MAIN DATA SWITCH LOCATED AT THE CANADIAN METEROLOGICAL CENTRE TENTATIVELY SET FOR WEDNESDAY MAY 19 0815 - 1015 UCT HAS BEEN RESCHEDULED FOR JUNE. THE EXACT DATE AND TIME WILL BE POSTED AS SOON AS IT IS FINALIZED. LES TRAVAUX SUR L'AIGUILLEUR PRINCIPAL DE DONNEES SITUE AU CENTRE METEOROLOGIQUE CANADIEN ORIGINALEMENT PREVUS POUR MERCREDI LE 19 MAI 0815 - 1015 UCT ONT ETE REMIS AU MOIS DE JUIN. LA DATE ET L'HEURE EXACTE SERONT ANNONCES DES LEUR CONFIRMATION. MCBEAN/TORONTO/ADMA