NOCN04 CWAO 171830 GENOT NO. 014 BILINGUAL MESSAGE - FRENCH TEXT FOLLOWS ENGLISH TEXT MESSAGE BILINGUE - LE TEXTE FRANCAIS SUIT LE TEXT ANGLAIS Y2K UPGRADE OF DATA SWITCH AT CMC THE Y2K UPGRADE OF THE CMC DATA SWITCH IS SCHEDULED FOR JUNE 22, 1999 BETWEEN 0815Z AND 1100Z. THE BACKUP DATE WILL BE JUNE 23 AT THE SAME TIME. THERE WILL BE TWO PERIODS OF DOWNTIME DURING THE UPGRADE OCCURING BETWEEN 0815Z-0850Z AND 1030Z-1100Z. DURING THE OUTAGES THERE WILL BE NO DISTRIBUTION OF ALPHANUMERICS BULLETINS. DATA WILL BE HELD AND RELEASED AFTER EACH OUTAGE PERIOD. MISE-A-JOUR A Y2K DU COMMUTATEUR DE DONNEES DU CMC LA MISE-A-JOUR A Y2K DU COMMUTATEUR DE DONNEES DU CMC AURA LIEUE LE 22 JUIN 1999 ENTRE 0815UCT ET 1100 UCT. LA DATE DE REPRISE SERA LE 23 JUIN AUX MEMES HEURES. IL Y AURA DEUX PERIODES D'ARRET DURANT LA MISE-A-JOUR, DE 0815UCT A 0850UCT ET DE 1030UCT A 1100 UCT. IL N'Y AURA PAS DE DISTRIBUTION DES BULLETINS ALPHANUMERIQUES DURANT CES ARRETS. LES DONNEES SERONT STOCKEES ET DISTRIBUEES APRES CHAQUE PERIODE DARRET. MCBEAN / ADMA / TORONTO